Balancing Inventory Reduction and Delivery Reliability with MRP

The purchasing manager of a manufacturing company faces two conflicting pressures at once: the general manager wants inventory costs brought down, while the sales team complains that delivery commitments to customers are not being kept. This tension is a genuine challenge in the production and supply management of many SMEs in Turkey. Reducing stock stretches delivery lead times; building up stock inflates warehousing costs. When the MRP (Material Requirements Planning) module is configured so that these two objectives work together rather than against each other, this tension can be largely resolved.

The core logic of MRP is to calculate which materials are needed, when, and in what quantity, based on the production plan and the bill of materials (BOM). This calculation alone is not sufficient, however, because not every product and every material carries the same strategic weight. If a high-turnover, customer-critical product is managed under the same stock policy as a low-turnover standard spare part, the result is either unnecessary overstock on the former or a critical shortage on the latter. The right approach is to classify products and materials by demand frequency, revenue contribution, and customer criticality, and then define a distinct stock policy for each class.

Demand classification in practice begins with ABC analysis. A high-revenue A-class products carry a high service level target, and safety stock is calculated accordingly; for low-revenue C-class items, a minimum stock policy is adopted. Demand irregularity must also be treated as a separate variable: the replenishment logic for a consistently selling product cannot be the same as for a seasonal or order-driven one. MRP modules offer parameters that support this distinction, but configuring those parameters to reflect factory reality demands considerably more time and attention than the software installation itself.

From a delivery reliability standpoint, the most tangible contribution of MRP is grounding the promised delivery date on a realistic basis by factoring in supplier lead times and production capacity. When the delivery date that the sales team commits to a customer can be confirmed from the system against current stock levels and supplier schedules, the cycle of over-promising and then apologising begins to break down. This function carries particular value in companies producing goods with many components, since a delay in a single part can halt the entire production line; MRP’s critical material alerts give planners the chance to intervene early.

The inventory reduction objective, in turn, depends on safety stock calculations being done correctly. In many companies, safety stock is set through experience-based estimates or a ‘the more we hold the better’ mindset, which leads to slow-moving stock piling up in warehouses and locking up working capital. When an MRP module can handle demand variability and supplier reliability as parametric inputs, safety stock calculation moves from intuitive guesswork onto a systematic footing. The result is that the same service level can be maintained with a lower average inventory; this difference has a direct impact on working capital, especially for expensive raw materials or long-lead-time components.

The most common practical difficulty is that the data needed to configure stock policy parameters correctly is not kept in a consistent, structured way inside the company. Supplier lead times are often agreed verbally and never entered into the system; demand history sits scattered across Excel files; bills of materials are not kept up to date. No matter how well-designed the MRP module is, if these inputs are incomplete or inaccurate, the outputs will be unreliable. For this reason, carrying out a dedicated data-cleaning and process-standardisation effort at the start of an MRP project prevents a great deal of disappointment later on.

When evaluating an MRP module, an SME manager would do well to ask the following questions: Does the software allow me to define a service level target at the individual product level? Does the safety stock calculation treat demand variability and supplier reliability as separate parameters? When a sales order is entered, does the system propose a realistic delivery date based on current stock and production capacity? If the answers are not a clear yes, then the software, whatever it calls itself, has been reduced in practice to little more than a stock-tracking tool. Managing inventory reduction and delivery reliability simultaneously is achievable, but it requires both the right software and the clean, consistent data infrastructure to feed it.

This article was originally written in Turkish by Gökhan MERCANOĞLU on April 18, 2005 and has been automatically translated into English and other languages using machine translation.


When post-erp improvement succeeds, it does not merely put more information on a screen; it gives management clearer decisions. Silos decrease, responsibility becomes visible, and measurable progress starts. Therefore, the issue is not tool selection but rebuilding operating discipline through technology.